Zhengzhou Partner Import & Export Trade Co., Ltd.
Zhengzhou Partner Import & Export Trade Co., Ltd.
[
Henan,
China (Mainland) ]
Henan, China (Mainland)
Partner
110
Meter
10
USD 10.000 - 60.000
China Port
7-15 days
paper box
Yes
6000 / Month
L/C, D/P, T/T, Western Union, MoneyGram
Packaging Details: | paper box |
---|---|
Delivery Detail: | 7-15 days |
diamond wire saw cutting
1.quarry, special shape processing
2.high sawing speed in diamond beads for wire saw
3.OEM.ODM
diamond wire saw cutting
Features
1.Fast cutting
2.Efficient sawing
3.Precise cut
4.Low noise emission
5.Cost effective
Advantage
1.Our wire saw is made keeping in mind the requirement of our customers.
2.Our diamond wire is ideal for cutting heavily-reinforced concrete in a range of industrial and heavy civil work.
3.Our wire is capable of cutting through the concrete of almost any thickness.
4.We use a special rubber bonding which makes the diamond wire highly flexible and reduces vibration curing cutting.
5.There are various specifications can be choose.
Diameter |
Fixation |
Beads No./Meter |
Process Range |
8.5 |
Mold infusing |
33,37 |
Granite divers-shaped |
8.5 |
Mold infusing |
33,37 |
Marble divers-shaped |
10.5 |
Mold infusing |
37,40 |
Granite-wasted plasticizing |
10.5 |
Mold infusing |
33,37 |
Marble-wasted plasticizing |
10.5 |
Plastic,rubber |
37,39/40 |
Concrete cutting,granite mining |
11 |
Spring ,mold infusing |
32,36 |
Marble mining |
Technical parameters:
Diameter |
Coating |
Stone hardness |
Wire speed(m/s) |
Cutting speed(m2/h) |
Life (m2/m) |
10.5mm |
Rubber+Spring |
Soft |
25-30 |
8-12 |
16-22 |
11mm |
Middle |
22-25 |
4-8 |
8-15 |
|
11.5mm |
Hard |
18-22 |
2-4 |
7-9 |
|
10.5mm |
Plastic+Spring |
Soft |
25-30 |
8-12 |
16-22 |
11mm |
Middle |
22-25 |
4-8 |
8-15 |
|
11.5mm |
Hard |
18-22 |
2-4 |
7-9 |
For granite quarry we recommend rubber and plastic wire,this assembly can protect the wire rope very well and increase the wire’s strength.
Note:
1. The rotation of the wire should be regularly checked
2. The beads wear profile should be regularly inspected
3. The connections should be changed whenever excessively high wear of the adjacent beads is noted and whenever it is necessary to apply pretorsion to the cable
4. During the sharpening of a new wire ,the liner speed must be reduced by 2-3m/s
5. Water spraying between 15-25L/min